Sheetrock Installation in Auburn, Washington

Sheetrock is one of the most important parts of any construction venture. Without it, a building cannot be erected. It is also one of the most tedious jobs to undertake and a serious mistake in the handling or application could lead to complete failure. There are many aspects to sheetrock installation that you should be aware of before you begin work.

Our Services

Sheetrock Installation

The first stage is the sheetrock installation that involves cutting, molding, positioning, setting the panels in place and securing them with joint compound. The second stage involves taping the joints and screwing them on both the walls and ceilings with drywall adhesive. This latter stage revolves around spraying and sanding these surface until the joints are smooth and you cannot tell where one sheet ends and another begins. During the third stage, concrete is poured into the spaces between the joints to complete the construction. For better results, you should use rebar to reinforce the walls.

Before you hire a contractor, check whether your local laws allow for drywalling in your area. You should find out whether there are any permits or licenses required for the contractor and if so, what sort of documentation you will need to obtain. There is nothing more frustrating than hiring a contractor who refuses to get the job done properly because he thinks he can get away with it using any kind of cheap materials. If you insist on having a drywall company do the sheetrock installation, make sure you get a written quote specifying all the costs and products that will be used.

The fourth and final stage of sheetrock installation is mud and finishing. The mud consists of grit from the truck tire, along with any loose dirt and debris that are not removed during the truck’s tour of the property. Once the mud has settled, the job is to apply a special mud and finishing compound called mud tape. This tape acts as a seal and makes it impossible for water to penetrate the drywall, which is vital for keeping the finished product in place.

Once the mud and tape have been applied, a drywall contractor will place a gypsum board between the two layers of drywall. A drywall contractor will use either a cement board or gypsum. Both are used for similar reasons-to prevent moisture from getting inside the finished product. Once the gypsum is applied, the sheetrock contractor will apply mortar mixture to the joint. If the drywall contractor is using cement board, the mixture will be applied with a brush.

Sheetrock installation is a very time-consuming project. The good news is that with modern technology, this task can be done much faster than it used to be. Most drywall companies offer high-tech equipment that cuts down on installation times while increasing the overall square footage of the project.

Drywall Hanging

Drywall Install

Drywall Finishing

Auburn Drywall Professionals
Who We Are?
Auburn Drywall Professionals will ensure that the quality of the finished wall will be at its best and you will receive the full value for your money.
Company Info
myemail@mailservice.com

(253)793-1331

Auburn, WA, United States